Projects

Date of completion: January 2012

Link:

Short description: For the Cherokee Tribe of Oklahoma, SAE completed construction plans and specifications for a new public CNG fueling facility a the Cherokee Tribe Outpost convenience store along Highway 62 south of Tahlequah, OK.  This project was completed as a part of a design build team with Red Stone Construction Services of Tulsa and Tulsa Gas Technologies.  This CNG station consists of a 125hp drive 4-stage Arrow Engine Compressor with 3 storage spheres, regenerative inlet dryer, ...

Date of completion: West Yard CNG - Summer 2012, Midtown CNG - Fall 2016

Link:

Short description: For the City of Tulsa, Small Arrow Engineering (SAE) has completed the development of plans and specifications for upgrading of the City’s CNG fleet fueling station at W. 23rd & Jackson (West Yard) to include increased quick fill compressor capacity, increased storage, a relocated 2 hose dispenser and new station electrical systems and controls. The station was also modified to include a public access canopy with two dual hose dispensers, a new slow fill compressor ...

Date of completion: Spring 2012

Link:

Short description: Taco Bell has been a mainstay at the southeast corner of 26th and Main for nearly 3 decades.  After the May 2011 Tornado destroyed the restaurant, ownership decided to rebuild at the same location on an expanded footprint.  The restaurant originally operated on only 2 lots at the intersection, and then acquired a third lot during pre-storm upgrades.  The storm provided ownership the opportunity to aquire 3 additional lots to the east of the restaurant,  ...

Date of completion: 2011

Link:

Short description: The Eastern Shawnee Tribe of Oklahoma (ESTO) has a long history of gaming at the Bordertown Casino at the Oklahoma/Missouri border near Seneca, MO.  When the tribe needed to expand their operations and offer hotel accommodations, they acquired a parcel at the intersection of Hwy 60 and 60 Business just southwest of Seneca for a new Casino/Hotel complex.  The tribe selected Redstone Construction Services to oversee this $90mil design-build effort along with Thalden Boyd Emery ...

Date of completion: 2013

Link:

Short description: In 2013, Missouri Southern State University (MSSU) passed a $14mil bond measure for design and construction of a 52 unit (208 resident) dormitory complex expansion along the north side of Newman Road (Rte TT) and the West side of International Ave.  MSSU selected RE Smith Construction to provide project CM at risk services, Bates & Associates Architects and SAE to provide Site/Civil Design services.  Concurrent with this project, MSSU also received a $2mil FEMA grant ...

Date of completion: 2013

Link:

Short description: In 2013, the Missouri Southern State University (MSSU) Foundation secured alumni donations for design and construction of an $8mil Stadium Field House complex.  The new North End Zone facility houses Athletic Dept. staff, Locker/Weight/Training room facilities, and Alumni Banquet space.  The 2 story building allows direct access to the Football field and track and screens the view of the field from Duquesne Road. MSSU selected RE Smith Construction to provide project CM at risk services, ...

Date of completion: 2014

Link:

Short description: In early 2012 High Plains Bioenergy, a subsidiary of Seaboard Foods, decided to begin an effort to convert their diesel based HD truck fleet to compressed Natural Gas (CNG). Small Arrow Engineering was engaged by High Plains Bioenergy to design and oversee construction of the Seaboard Live Haul CNG facility in Guymon and at the Seaboard Feed Mill in Optima, OK. Over the next 2 year period, Seaboard converted approx. 200 HD trucks and 75 ...

Date of completion: May 2012

Link:

Short description: For the City of Norman, SAE completed the development of plans and specifications for a new public CNG fueling station and a new fleet CNG slow fill station at the City of Norman fleet maintenance facility at 1301 Da Vinci. The public CNG fueling station is located at the Goddard Ave and Flood Ave (Hwy 77) intersection, adjacent to Max Westheimer Airport. This station was funded with a grant from the Dept. of Energy (DOE) ...

Date of completion: July of 2012

Link:

Short description: For the City of Owasso and Blue Energy Fuels, SAE has completed development of plans and specifications for construction of a new public CNG fueling station in downtown Owasso. This ARRA funded project includes a 4 stage 125hp electric drive compressor with 3 storage spheres, an inlet dryer and two single hose dispensers under a new canopy.  The CNG station also has a façade designed to match a Rte 66 historic theme with faux gasoline ...

Date of completion: January 2012

Link:

Short description: For Mathes Brothers Furniture and Reno Partners, LLC, SAE completed the develop ent of construction plans andspecifications for a new public CNG station at the existing Reno Partners Convenience Store at Reno and Portland Ave. in Oklahoma City. The station components consist of two 125hp electric drive 4-stage Arrow Engine compressors in sound enclosure cabinets, a regenerative inlet dryer, 3 CNG storage tubes, two dual hose dispensers with 2 card readers located adjacent to the ...